Stainless banana processing line with conveyors and process equipment
Process flow reference image. The actual line follows the selected raw material and finishing route.

01

Whole-fruit branch

Receiving → inspection → washing → sorting → peeling → flesh inspection → feed. The preparation equipment is omitted for purchased peeled flesh.

02

Core branch

Feed → pulping (one or two stages) → refining → transfer. The texture target determines the screen and the number of stages.

03

Finishing branch

Deaeration assessment → heat treatment → filling → package. Or: transfer directly to a customer process. Freezing is a separate handover.

04

Service branch

CIP, drain-down, cleaning verification and changeover run across the whole line. They are not a final box after the process.

StageInputOutputDecision
PreparationWhole fruitInspected fleshManual/assisted/mechanical peeling
FeedingFleshControlled feedHopper/feeder type
PulpingFleshpulpeOne or two stages
RefiningpulpeRefined pureeScreen and texture target
TransferPureeProduct at next processPump principle and route
FinishingPureeFilled packageFrozen, aseptic or existing process

Before you enquire

Practical questions

Where does deaeration fit in the flow?

It can sit before heat treatment or filling, depending on the oxygen-control strategy. It is not a universal step.

Where does cleaning fit?

Cleaning is a line-wide activity at the end of a run and during changeover. The circuit and access should be designed with every product-contact machine.

These notes are a project-preparation framework, not a validated operating procedure or a performance guarantee.

Next step

Put the product in the brief.

Share the actual feed, texture target and measurement point. The equipment discussion becomes much more useful.

Request a quote